微信掃描二維碼,即可將本頁分享到“朋友圈”中。

OWE 2017: Senvion keeps tight-lipped on 10MW turbine
2017-06-09
來源:windpower
瀏覽數:639
UK: Having let slip that it was working on a 10MW-plus offshore turbine at the AWEA conference in May, Senvion has
UK: Having let slip that it was working on a 10MW-plus offshore turbine at the AWEA conference in May, Senvion has declined to provide any further details at the London offshore event.
- 閱讀上文 >> LM completes Hitachi 5.2MW blade tests
- 閱讀下文 >> 舒印彪董事長在清潔能源部長級會議上都忙了些啥?